
Blowtherm · Downdraft
Blowtherm BITA 7.5 Meter
Filter kit, alternatives, and current pricing for the BITA 7.5 Meter.
Required filters
Recommended kit for this booth
2 matched filters across 4 slots.
Complete kit total · $658.85
Intake side (clean air going in) (3 slots)

AMU pre-filter
AMU pocket bag pre-filter · 23.25x47x8
Special order · 1–2 weeksViledon F45A 1/1 High Performance Pocket Filter
BFP-PB-VILEDON-F45A· 60–90 day cycle$349.44

Ceiling intake
Ceiling diffusion polyester · 68.5x134
Special order · 1–2 weeksFiltrair FF560GX 68.5x134 Ceiling Diffusion (PA560G-10), Blowtherm 7.5m primary
BFP-CD-FILTRAIR-FF560-685134· 30–60 day cycleQuote on request

Intake Ceiling 2
Ceiling diffusion polyester · 78x134
Special order · 1–2 weeksFiltrair FF560GX 78x134 Ceiling Diffusion (PA560G-10), Blowtherm 7.5m secondary
BFP-CD-FILTRAIR-FF560-78134-7M· 30–60 day cycleQuote on request
Exhaust side (overspray coming out) (1 slot)

Pit exhaust
Fiberglass exhaust arrestor · 30x300ft
Special order · 1–2 weeksAFT 22-gram Fiberglass Roll 30x300ft
BFP-FG-AFT-22G-30R· 7–14 day cycle$309.41
Not finding the right match?
We carry many filters beyond what's shown here. Tell us about your booth and we'll send you a price and ship ETA within one business day.
Don't see your filter? Request a quote →Blowtherm model • BITA 7.5 Meter
Blowtherm BITA 7.5 Meter Filter Fitments
This page starts from the slot data because on this booth the slot data is the story. Three independent filter manufacturers list the same ceiling layout for the BITA 7.5 meter, four sections at 68.5 x 134, which is about as strong as catalog evidence gets short of a tech standing in the booth. The 7.5 meter cabin length, roughly 24.5 feet, is the reason this model exists: it swallows long vehicles and full frames that a standard collision booth cannot close its doors on. More cabin means more ceiling, and more ceiling means the intake media plane is both the booth's finish-quality engine and its main consumable.
Quick answer
Four ceiling sections in the 68.5 x 134 size: that is the documented slot program for the Blowtherm BITA 7.5 meter, a downdraft booth we carry as a catalog-discovered fitment, cross-referenced from AFT, Viledon, and Viskon-Aire filter catalogs. As a downdraft, it pairs that ceiling intake stage with exhaust media below the floor grating, and Blowtherm installations typically add an AMU prefilter stage ahead of the heater. Ceiling media in this size is orderable now; pit and AMU positions get confirmed with a fitment check against your specific installation before bulk ordering.
How BITA 7.5 Meter shops choose filters
Ceiling program. Four sections at 68.5 x 134, per the distributor catalogs that surfaced this model. Diffusion media across that plane does two jobs at once: final filtration of the heated makeup air and velocity smoothing so the downdraft lands evenly over a long cabin. Order all four sections together; mixing old and new sections skews airflow toward the fresh media.
Exhaust side. Downdraft means the floor takes the overspray. Pit or basement exhaust media below the grating is the loading stage, and on a 7.5 meter cabin the pit run is long, so walk the whole grating when you inspect rather than checking one end. Pit media dimensions vary by installation and are confirmed at fitment check.
AMU prefilter, read this before ordering. Our catalog notes that some older Blowtherm units take an AMU prefilter without a header. Header and headerless bags are not interchangeable in the same frame, so check which style your air makeup unit holds before you order that position, or send a photo with your fitment check and we will identify it.
Regulatory landscape
The compliance load on a long downdraft sits at the floor. EPA 6H requires demonstrated 98 percent capture efficiency at the exhaust filter stage for shops spraying target HAP coatings, and it expects filters present and maintained whenever the booth sprays. OSHA 1910.94(c) requires the ventilation system to hold design airflow, which a blinded pit run defeats. NFPA 33 governs the accumulation side: spent pit media loaded with overspray is combustible and needs scheduled removal and proper disposal. Because the BITA 7.5 meter often runs commercial and fleet work, inspectors tend to visit; dated delivery records for every change-out make those visits short.
Who runs the BITA 7.5 Meter
Shops running the BITA 7.5 meter usually got it for length. Fleet and commercial refinishers painting vans, box bodies, and duallies are the first group. The second is heavy collision operations that quote frame-length repairs and cannot shuttle long vehicles to an oversize booth across town. Third, restoration shops working on trucks and long-wheelbase classics, where a standard cabin forces painting in sections. All three put serious square footage of media through the booth per year, which is exactly the profile where a scheduled kit beats ad hoc ordering.
BITA 7.5 Meter filter FAQs
How confident are you in the four-section ceiling layout?
It is documented independently in AFT, Viledon, and Viskon-Aire catalog listings, which is why we publish it. That is catalog-discovered confidence, not a tech-measured booth, so if your ceiling grid differs, send photos and measurements and we correct the record for your account before shipping.
What does 68.5 x 134 mean for handling and installation?
These are large ceiling sections, and on a downdraft they install overhead. Plan two people for the change, replace all four sections in one session, and schedule it with a pit media change so the booth's pressure balance resets as a system rather than one stage at a time.
My Blowtherm AMU prefilter has no header flange. Is that wrong?
Not necessarily. Some older Blowtherm units are built for headerless AMU prefilters, per our catalog notes on this line. Match what the frame was built for; forcing a header-style bag into a headerless track (or the reverse) leaks bypass air around the media.
Why is only the ceiling listed with exact dimensions here?
Because that is the slot the distributor catalogs document for this model. Pit exhaust and AMU dimensions vary by installation year and site configuration, so we confirm those against your booth during the fitment check rather than printing a guess next to verified data.
Does the longer cabin change my exhaust media schedule?
The schedule driver is what you spray, not the cabin length, but a 7.5 meter pit run has more media area and loads unevenly along its length, heaviest where the work sits. Inspect the full run and change on manometer reading, not on the calendar.
Sources
Primary references cited on this page.
- EPA 40 CFR Part 63 Subpart HHHHHH (NESHAP 6H)https://www.epa.gov/stationary-sources-air-pollution/national-emissions-standards-paint-stripping-and-miscellaneous
- NFPA 33, Standard for Spray Application Using Flammable or Combustible Materialshttps://www.nfpa.org/codes-and-standards/nfpa-33-standard-development/33
- OSHA 29 CFR 1910.94(c), Ventilation: spray finishing operationshttps://www.osha.gov/laws-regs/regulations/standardnumber/1910/1910.94
Related on BoothFilterPro
- All Blowtherm models
Brand hub
- BITA 8.0 Meter
Sibling Blowtherm model
- World
Sibling Blowtherm model
- Extra
Sibling Blowtherm model
- World/S
Sibling Blowtherm model
- Space
Sibling Blowtherm model